Productive Weekend
|
Two halves make one door.
Driver Floor Section Replaced.
Rear floor section replaced.
Not pictured, additional structural support under the very rear section of flooring welded to the frame to support the last 6 inches of replaced flooring and future wall installation. |
|
All times are GMT -5. The time now is 12:16 PM.