Journey with Confidence RV GPS App RV Trip Planner RV LIFE Campground Reviews RV Maintenance Take a Speed Test Free 7 Day Trial ×


Productive Weekend
Two halves make one door.
Driver Floor Section Replaced.
Rear floor section replaced.

Not pictured, additional structural support under the very rear section of flooring welded to the frame to support the last 6 inches of replaced flooring and future wall installation.
Passenger side rear corner replacement.
Driver side rear corner replacement
Finished rear floor section.
Insulation filling.
Redesigned trans cover and floor
Finished replacement - Driver's floor section.
Very wide door opening now.
Door turned into one.

All times are GMT -5. The time now is 12:16 PM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.