So work was at a standstill for the cold weather. The bus was in a area of my shop I was adding on. It stayed there throughout the cold and heavy snow but I moved it out. Still working on the area of the building.
Started back in on it today.
Heater/Ac unit worked great 32 degrees to 60 in about an hour. While going in and out of the bus.
The main floor space is done
Working on the air ride seat.
And a wiring change.
Then I will finalise the bathroom.
Looking for the quietest composting toilet.
Well maybe the least smelling.
Actually need to finalise the sink plumbing.
Well after posting to the wrong thread let me try this again
So it’s been a while other than some plumbing and figuring out how I want to do the shower/wet loo interior. It is basically finished.
I stalled on the project due to a health issue with my dad and not having a title or interest from the rally car partner.
My tire guy offered me a set of super singles for a reasonable price. Need to get them.
Title work is done rally car partner needs to sign it over so I can get it in my name with plates and insurance.
Skinning the outside and finish the house battery tray. And away we go.
Still working on the outer skin,but needed to move the trailer to make some winter room.
And clean the yard for winter.
60plus feet of trailer and bus.
Making room to put the bus inside for som work.
On a side note our e39 racecar Is on a display and in grassroots motors sports for champ car
Been busy at work
But making progress on the outer skin and outer insulation.
Make the lower transition finish step
I already made the uppers. Make to doors and this side will be done.