The bus has come a long way since my last post. welded some floor patches, welded mounts for an awesome roof deck, front hitch for a bike rack, rear hitch for pulling things and a much needed step up, new subfloors and flooring, new nice leather seats, couch, new air ride drivers seat, beadboard and trim, and the list goes on.
We've driven several thousand miles, went to the beach in south Georgia, Atlanta to Savannah, North Georgia, Camping, Talladega, concerts, bachelor parties, etc. Been the best investment ever.
I apologize as a lot of these pictures are out of order but you get the general idea.
Next is electrical and I have some questions I will outline in the next post...
Hole in floor that was patched.
Bare steel floor with rustoleum rusty surface primer
Sub floor going in
Sub floor going in
Sub floor going in
Flooring installed, Homedepot traffic master $1 per sqft
Flooring installed
Drivers seat riser
passanger seats going in, Suburban Seating Company seats, about $400 a pop x 12, last row facing rear of bus.
Mounting brackets
seat
roof patio install
Front hitch bike rack
Hasp lock install, welded to door
Hasp lock install, welded to door
Hasp lock install, welded to door
You can see Beadboard and trim work here, not completed but 90% done
Seating installed
img host