Been doing as much research as I can and this is what I am thinking my system should look like: I have a fuse in-between the charge controller and battery bank and a fuse between the solar and charge controller. From what I've read I should not ground the MPPT to the shunt as this could give my battery monitor weird readings. I will then hookup the inverter with the ground for the inverter going to the chassis and not the shunt. What will be hooked up to the shunt is the battery monitor, the inverter to battery ground, and the 12v fuse block.
Does that seem like a good way to run the system?
|