Quote:
Originally Posted by cadillackid
be careful about schedule 80 or even CPVC.. max temp i thought on most schedule 80 is 140-160f and CPVC is 200, high temp PEX is 200.. your coolant temps may very well reach or exceed those numbers at times.. and while your heater valves are likely closed in summer.. it would suck to forget, run the bus up a hill get to 210 and fail a pipe because of an over-site.. id either run 3/4" copper hardlines or keep the hoses in such a way you can repair / replace if needbe/..
-Christopher
|
we replaced all the hose with 5/8ths inch but now I need to connect the new hose to the old hose and then at some point to the heater again. we will move the loop to the end of the new hoses until we get to the heater replacement/hook up. **** I just realized we either need a new 5/8th loop or reducers for that end as well unless we wait until we hook the heater up. AUGH.
so I have looked on line and I don't see what I need to connect the old 1"ID hose to the new 5/8th ID hose. The hose runs along the floor under the step at the emergency door and over the wheel wells and I am going to shove some rubber and or insulation at all the points where it could rub.
The quick connect style cheapo plastic things are NOT what I want to use. I want something that should hold up for a LONG time. can you suggest a specific product? Brass plumbing reducer maybe? any advice would be very appreciated.