floors and walls

Hello, let me catch you up to speed on what I am doing with my schoolbus. At this point, I have taken out the seats, the heaters, and the floor, painted the metal floor with rust stopping/killing base paint, and sealed up the holes that the seats were bolted through. Now I need to put in a floor, this is what I am wanting to do. I want to put in some tongue and groove wood, probably bamboo as I saw on lumber liquidators online that I can purchase it for about $1.75 a sq. ft. (my bus totalling roughly 300 sq. ft.), also thinking I should put some sort of pad or insulation down, as the cold metal will leech heat from the wood, or disperse cold to the wood. My question is, should I build my wall sections first, then put my flooring in and work around walls, or should I put floor in and then build walls so that i can screw into wood for better stability and durability? Also, if you have some insight or advice on the flooring process or what materials you went with, it would be greatly appreciated to share some ideas with me. Thanks all, for working with me through my exciting project.

jjhomeonewheels is offline   Reply With Quote
Old 11-15-2012, 10:04 AM   #2
Bus Nut
 
Join Date: Jul 2010
Location: Elk Plain, WA.
Posts: 513
Year: 1993
Coachwork: Genesis
Chassis: International
Engine: DTA360
Rated Cap: 16
Re: floors and walls

I choose to do my floor last... There's no way I could have kept from destroying it with the way I'm building my interior...

I was a general contractor and the floors were always toward the end...
dirtygoat is offline   Reply With Quote
Old 11-15-2012, 12:20 PM   #3
Bus Crazy
 
roach711's Avatar
 
Join Date: May 2010
Location: Farmington Hills, Mi (Detroit area)
Posts: 1,968
Year: 2000
Coachwork: Eldorado Aerotech 24'
Chassis: Ford E-450 Cutaway Bus
Engine: 7.3L Powerstroke
Rated Cap: 19
Re: floors and walls

I went pretty much the same route an Glenn. 3/4" poly iso insulation board covered by 3/4" tongue and groove and linoleum over it all. I also put in some thin wood strips to keep the insulation from getting squashed down.

__________________
The Roach Motel
roach711 is offline   Reply With Quote
Old 11-15-2012, 03:07 PM   #4
Hex
Skoolie
 
Hex's Avatar
 
Join Date: Jul 2008
Location: Buffalo, New York
Posts: 191
Year: 1995
Coachwork: Bluebird, Model 3800
Chassis: International
Engine: T444E
Rated Cap: 42
Re: floors and walls

I'm with dirtygoat in that I'm leaving the finished floor until last to preserve it. I'm shooting for maple t&g as the final flooring. After cleaning everything down to the steel floor, I went with paint, then roofing paper, then 3/4" foil-backed rigid insulation & 3/4" x 2" battens, covered with 1/2" plywood.

I'm still working out how to prep for the tiling in the bathroom (whether to have a full 3/4" of insulation under the latex-impregnated gypsum-board), but I think it'll be in there, at least outside of the shower area.

And you might want the insulation not just to preserve the flooring, but also to cut road noise. Having the amount of floor that I've got done in has made a great difference in my bus.
Hex is offline   Reply With Quote
Old 11-15-2012, 04:33 PM   #5
Almost There
 
Join Date: Feb 2011
Location: Augusta Arkansas
Posts: 85
Year: 90
Coachwork: Volunteer
Engine: 366
Rated Cap: 65
Re: floors and walls

I used 1/2 foam insulation with the aluminum bareer on it, then used 5/8 tounge and grooved sturdy floor. I was gonna put the vynle flooring down first since it would be alot easier to do know but I ended up not havi g enuff of that, so I started the walls and will lay down tongue and grove hardwood, I got a deal on it so that's my route. I can say this I been running a propane infrared heater which if you look in my pics you can see it, but with in 20 mins it will run you out on low.
Six Four is offline   Reply With Quote
Old 11-15-2012, 06:16 PM   #6
Almost There
 
kimberlink's Avatar
 
Join Date: May 2012
Location: Millstadt Illinois near St Louis MO
Posts: 89
Year: 1998
Coachwork: Crown
Chassis: International
Engine: DT466 / AT545
Rated Cap: 71
Re: floors and walls

My vote is for the Foam and Tongue and groove Plywood first and then walls and finished floor covering last.

Just my vote
__________________
The most terrifying words in the English language are: I'm from the government and I'm here to help.
Ronald Reagan

https://s1253.beta.photobucket.com/us...k1961/library/
kimberlink is offline   Reply With Quote
Old 11-16-2012, 06:36 PM   #7
Bus Nut
 
Join Date: Jul 2010
Location: Elk Plain, WA.
Posts: 513
Year: 1993
Coachwork: Genesis
Chassis: International
Engine: DTA360
Rated Cap: 16
Re: floors and walls

I plan on doing my floors with a garage floor parking pad... It's thick rubber, 7'6"x20' roll and diamond plate textured to match a lot of the material I've used... I'll use a roll of thick brown painters paper to make a template, so it'll be cut to fit... I want it removable for cleaning and fixing stuff... Not sure how insulating it is, but I've spent tons of hours standing on concrete in the winter out in the garage and the thick rubber mats work the best at keeping your toes from falling off...
dirtygoat is offline   Reply With Quote
Old 11-16-2012, 07:04 PM   #8
New Member
 
Join Date: Jul 2012
Posts: 5
Year: 1969
Coachwork: Crown
Chassis: crown
Engine: 743 Cummins
Rated Cap: 75
Re: floors and walls

I hoping not to change the floor in my crown- it's 1 1/2" marine ply on the metal frame work of the chassis.. the walls are just stainless inside, covering the outside... the big project is pulling the ceiling out to put 1" foam insulation up there , then some in the walls .. fun ..
moosiah is offline   Reply With Quote
Old 11-27-2012, 06:22 AM   #9
Mini-Skoolie
 
Join Date: Jul 2011
Posts: 12
Year: 92
Coachwork: Carpenter
Chassis: International
Engine: DT 466
Re: floors and walls

Quote:
Originally Posted by dirtygoat
I choose to do my floor last... There's no way I could have kept from destroying it with the way I'm building my interior...

I was a general contractor and the floors were always toward the end...

For those that decided to put their floor in last, what did you do to stabalize the walls? did you bolt the walls down through the metal floors and then when you apply flooring do you plan to build around walls? And for those that did floors before walls, did you drill/bolt dirrectly into wood floor and metal when putting up the wall?
jjhomeonewheels is offline   Reply With Quote
Old 11-30-2012, 08:33 PM   #10
Bus Nut
 
Join Date: Jul 2010
Location: Elk Plain, WA.
Posts: 513
Year: 1993
Coachwork: Genesis
Chassis: International
Engine: DTA360
Rated Cap: 16
Re: floors and walls

Just like when building a house, attach walls to floor, ceiling, exterior walls... Then final floor built around walls... If I have to take up the flooring for any reason, I don't want to remove walls... That's just me though...
dirtygoat is offline   Reply With Quote
Old 12-01-2012, 08:01 AM   #11
Bus Geek
 
lornaschinske's Avatar
 
Join Date: Jun 2004
Location: Roswell, NM
Posts: 3,588
Year: 1986
Coachwork: BlueBird
Chassis: 40 ft All American FE
Engine: 8.2LTA Fuel Pincher DD V8
Rated Cap: 89
Re: floors and walls

We were also in construction and have installed many floors of hardwood & ceramic tile. Our finished floors will go down as one of the last things. Our floor will be insulated under the bus. We will be using 12x12 Commercial Vinyl Tile (in stock at the store I work at) glued down to the original incredibly well stuck rubber bus floor covering. I will use inexpensive "throw" rugs on the floor (the kind you "throw away" when they get too dirty & stained). Our walls are secured to the floor ("L" brackets) and the original walls (board screwed to wall then the wall panel is screwed to the board). Our wall panels are flush doors. We can't build a real finished 2 sided wall for $1/inch. One of the doors we bought was a damaged prehung/prebored 36" door. I got it marked down to $10. We only needed about 15" so we trimmed off the "hole" for the door knob (cut off the damage at the same time), trimmed the height and put it in place. The frame that came with the set up was turned into a face frame only vanity. And I still have the door stop molding that will be used to trim my flat panel plywood vanity cabinet doors (to make them look like a "normal" flat panel door with the raised edges). I want all my cabinet doors to be on the thick side so that I can screw hooks and eyes (to hold things) any place I want on the backside of the cabinet door. So we are using thicker plywood and applying screen molding to the face.

We are also using a cheaper plywood ($20 per sheet) and skimming Rock Hard Putty to cover the imperfections in the wood. Since we are painting the cabinets inside & out, we can get away with this and I wanted a really hard filler for all the filled spots. I am not happy with most of the lumber. Quality has gone way down and prices have gone up. To get a decent sheet of plywood would cost us over $30. David had bought that huge can of putty back during the summer to make a repair on the roof of the food cart (rotted spot on roof). I figured we might as well use it. I mixed it up (add water to the dry powder) a little thin and spread a really thin coat on, scraping the excess off, just to fill the depressions and knots. David says this stuff dries harder than the wood it fills. Said to keep it as thin as possible otherwise I would spend far too much time sanding. So I skim coated the floor panel of one cabinet - interior, exterior (won't be seen since it's the bottom but it will get painted), as well as the front edge so I won't have to buy edge banding tape (which may or may not peel off later). I have tomorrow off so I will finish filling/sanding the sink side of the galley then. Next week I will have a working kitchen sink... no more washing dishes in the food cart or bathroom sink! Today while I am at work, David will put together the plumbing supply/drain lines and connect it to the appropriate inlet/outlets. Next paycheck will mean the shower walls and maybe a water heater. No more freezing cold bathhouse (they claim the heat is on but it's not)! With all the extra hours I've been getting, we are trying to get as much done as possible. Once all the must haves are done (by Christmas???), I can start buying the "I wanna's"... like a used washer & LP dryer. I really don't want to schlep our laundry back & forth to the laundry room in the wintertime.

For our Black Friday sales, Home Depot had Allure flooring for under $1/sq ft "while supplies lasted". By end of Saturday it was all gone and we had a lot of it. Maybe they will run another sale on it for Christmas.
__________________
This post is my opinion. It is not intended to influence anyone's judgment nor do I advocate anyone do what I propose.
Fulltime since 2006
The goal of life is living in agreement with nature. Zeno (335BC-264BC)
https://lorndavi.wordpress.com/blog/
https://i570.photobucket.com/albums/s...ps0340a6ff.jpg
lornaschinske is offline   Reply With Quote
Old 03-28-2018, 03:53 PM   #12
Skoolie
 
mikerob643's Avatar
 
Join Date: Mar 2018
Location: Flagstaff AZ
Posts: 149
Year: 1996
Coachwork: Thomas
Chassis: Vista 36pp
Engine: 7.3 L diesel
Please read the reply below my phone accidentally double post ( dang phones )
mikerob643 is offline   Reply With Quote
Old 03-28-2018, 04:07 PM   #13
Skoolie
 
mikerob643's Avatar
 
Join Date: Mar 2018
Location: Flagstaff AZ
Posts: 149
Year: 1996
Coachwork: Thomas
Chassis: Vista 36pp
Engine: 7.3 L diesel
After everyone puts down the insulation . how are you attaching the tongue and grove plywood down of the " floating floor" ? Are you drilling it to the strips of wood in between the insolation or are you Drilling self tapping metal screws down into the floor? And if so , are you worried about having the holes in your floor?
I've been wondering about this for attaching the floor as well as attaching the walls and roof.
I have been reading a lot about self tapping screws but it seems like screwing into the sheet metal would cause holes and then you would have screw and poking out on the outside. My thought is maybe everyone is just attaching to the metal ribbing for the walls and ceiling, but I'm still a little perplexed about the floor.
mikerob643 is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Who here has tiled their floors? lornaschinske Conversion General Discussions 6 08-27-2020 03:10 AM
Tile floors in bus, has anyone done this? Almanzo Conversion General Discussions 5 07-03-2014 10:13 AM
Floors bus-bro Conversion General Discussions 1 04-08-2013 10:57 AM
Removing Floors pipsqueek Conversion General Discussions 3 10-04-2010 12:51 PM
Bus floors/plumbing wmah Conversion General Discussions 0 08-14-2006 06:15 PM

» Featured Campgrounds

Reviews provided by

Powered by vBadvanced CMPS v3.2.3

All times are GMT -5. The time now is 01:15 AM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.