Got something visible done today, finally!! I actually got the propane tank mounting system engineered and installed into the bus last weekend, but got the access door for it cut today, and finished bolting it all up in place. I have a complete write-up with pictures posted
HERE
I also got the gray tank hung beside the black tank. The black tank has been there for over a month, but just got around to mounting the other tank. I was a must do as I've been running plumbing the last few Sundays, and need to terminate the drain pipes to the tanks. I have some pictures and write-up for that too located
HERE