My project....
1995 International 3800 T444E
20170819 142920
20170819 132537
20170815 144058
20170807 153515
20170807 153457
20170801 144805
20170801 144747
20170801 144736
20170731 213213
20170727 175504
Ceiling
Hanging insulation
Hanging insulation
No shower yet...that's forthcoming.
An idea of how it will look.  Almost there....
Floor is all done....FINALLY
20170610 145040
20170610 105255
20170609 210217
20170609 201832
20170609 184525
All 3 new steel panels down.
1'st new steel panel on the floor.
Floor repairs
 

All times are GMT -5. The time now is 09:54 PM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions, Inc.