My bus project
Bus progress pictures.
Saved my blue bird lights, replaced bulbs with LED and rewired to my house battery. Had to add a ground wire as my ceiling is now wood.  Can't wait...
AC working Sept 2018. First try blew CGSI plug upstream of shore plug in, then read that newly installed CGSI (in my kitchen) are meant to trip first...
Hard to beat such fine workmanship eh? Supposedly both cabinets are "square." You just do the best you can, but worth something to do it all...
Firing up the cubic mini before installing.
Have a Progressive Dynamics AC/DC fuse/distribution box. Unclear on back which slot is positive or negative as it doesn't say.
Have a 9000 series Progressive Dynamics charger and a Concord 210 amp AGM battery. A little fuzzy on correct way to attach, though know from...
Got the NovaKool 5810 cabinet just done today. Hopefully will have wiring done within a month. Made a 2x4 platform for fridge with side by condenser...
Used metal from inside, upper back to plug holes from school lights both front and back.  Lots of caulk, inside and out. Hopefully primed gray soon...
Ah the challenges of living in a bus while working on it (and making a huge mess with sanding, etc.).  Goal is to have AC electrical, DC for...
Caulked all roof seams, removed external caulk from roof exits, and added some bolts rather than screws where they added some funky brackets. Then 3...
Bought tin ceiling tiles and painted them. Will go along center of ceiling with cedar tongue and groove on either side.
Looks pretty nice. Used thick cedar for the bottom two rows and have that ultra thin closet lining tongue and groove above that.  Seems to work. ...
finally putting in the ceiling. Used pieces of plywood 5" wide by 3.5" deep and screwed these into ribs, then cedar tongue and groove is screwed to...
Wheel chair lift door, sealed up.
Just finished bed (maybe I had phone upside down, not sure why it is flipped here).
Bus parked by river May 2018.  Damaged a couple of things moving it here when I caught on logs. Danger is below when driving as that is the blind...
Cubic mini stove - almost ready. Ends up cap I bought needs modification though. Nothing comes easy on a skoolie.
1/2" styrofoam and 1/2" plywood finish out the door and it is flush with wall.  Will frame window opening and continue tongue and groove cedar along...
Wanted to disable this door, so took out hardware (yes all screws frozen) then made a slot on the right (drill bits and lots of chisel work) then got...
Electrical cabinet over front, passenger wheel well.
Built chest of drawers around used drawers -over wheel well.
March 2018 electrical cabinet. Shows cedar tongue and groove walls - roxul and two layers of tyvek underneath - wood attached to 2x4's set in wall. ...
January 2018 - Ceiling removed. Not too bad, about 6-8 hours work.  Bus very cold now so hoping to redo it soon.  Would have saved metal ceiling if...
Jan. 2018 - Side wall insulation. Applied vapor barrier, then used rivet holes to screw 2x4 to underneath window sill and after filling lower area...
plywood on back up to front wheel wells - oct 26 2017
 

All times are GMT -5. The time now is 10:22 PM.