Journey with Confidence RV GPS App RV Trip Planner RV LIFE Campground Reviews RV Maintenance Take a Speed Test Free 7 Day Trial ×


MulletTheBus Build
This is the progress so far on the build out of TwoFerry's "International" shortie HQ
1A49F6AE 64B6 421E BC5A 129E9BC6A439
Roof paint - Rustoleum white, rolled on.
Cabinet dry fit
Cabinet dry fit
Plumbing for sink and toilet roughed in
wall
wiring
Wall insulation
Prepping for the wall build
Those floors!
Seat!
Waterproof vinyl click and lock flooring being installed
Insulation and plywood install
Floors prepped and painted with rustoleum, ready to frame and insulate!
Removed the rear heater, but closed the loop so the front heater would still work!
Floor repair after that awful L track and existing plywood was removed
Windows removed and replaced with 16g sheet metal
The beginning!

All times are GMT -5. The time now is 04:42 AM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.