Picture 8 of 10 from Album Starting the Yellow Palace!
Step two will involve ripping this ceiling and side panels out, ripping out the insulation, and removing the heater and ducts, intercom, and dome lights.
Step two will involve ripping this ceiling and side panels out, ripping out the insulation, and removing the heater and ducts, intercom, and dome lights.
Picture Added 05-08-2015 10:21 PM
Added by HesterBest

All times are GMT -5. The time now is 10:50 PM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions, Inc.