Picture 8 of 21 from Album Bus Deck Project
6th, predrilled and screwed in the pressure treated 2x4 supports into the rim. this made the entire structure completely solid. the middle is suported by the 2" rigid on top of the arch of the roof.
6th, predrilled and screwed in the pressure treated 2x4 supports into the rim. this made the entire structure completely solid. the middle is suported by the 2" rigid on top of the arch of the roof.
Picture Added 06-15-2016 03:16 AM
Added by Majikfoolbus

All times are GMT -5. The time now is 01:23 PM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions, Inc.