The composting toilet has arrived. The electric generator push pull thing has arrived. The Big Foot levelling system is ordered, The 8kva genset is being ordered tomorrow. Bought a mig welder so the under body storage can be being started next week. 240' of 2' x 2' RHS for the framework. 111 gallon roto-moulded fuel tank being made next week, Then order a 100 gallon water tank and 90 gallon grey water tank, along with a potable water power reel and powered shore power reel.