|
|
My bus the day I went to test drive it
St.Cloud ,Minnesota
Date: 02/22/2004
Views: 1825
|
|
Bus 9 after painting most of the body.
Color is Ford Baham blue, ran out of good weather to finish painting.
Date: 02/22/2004
Views: 1550
|
|
Looking from the Back of the bus to the front from the Ceiling
Date: 02/23/2004
Views: 1863
|
|
|
This is what bus 9 looked like from the ceiling in the Front of the bus towards the Back
Date: 02/23/2004
Views: 1665
|
|
bathroom/bedroom walls frameing begins
Date: 02/23/2004
Views: 2211
|
|
Shower Stall bottom
Date: 02/23/2004
Views: 1980
|
|
|
The stalls bottom is marked out on the bus floor and i used a aerial hole saw(drill bit) to make the points in the corners where
Date: 02/23/2004
Views: 1657
|
|
Looking from the rear towards the front on the drivers side the hole for the shower tub has been cut through with the sawsall. T
Date: 02/23/2004
Views: 1801
|
|
Here I am(Andy) sitting in the shower stall hole before installing the shower tub.
Date: 02/23/2004
Views: 1900
|
|
|
Here is the newly cut shower stall tub formerly the stainless steel kitchen sink. It looks rusty but is not. The previous owner
Date: 02/23/2004
Views: 1847
|
|
Almost complete shower stall. This has the 2x2 frames up and the shower stall pannels installed. There will be on the right a se
Date: 02/23/2004
Views: 1622
|
|
Bus wall without sheet metal over it. This peice of pvc will have a wire going through it for 110 service. It keeps the wire fro
Date: 02/23/2004
Views: 1563
|
|
|
Installing New Insulation and the use of a dual vapor barrier. I had a huge role of plastic that was bent down the middle. I cut
Date: 02/23/2004
Views: 1745
|
|
Installing wall pannels
Date: 02/23/2004
Views: 1717
|
|
More Pannels up you can see the outlet boxes with the wires coming out
Date: 02/23/2004
Views: 1622
|
|
|
Outlet box with wire hanging out
Date: 02/23/2004
Views: 1341
|
|
Bedroom wall pannel. Driver side wall , to the left it the emergency door to the right is the back frame wall of the bathroom
Date: 02/23/2004
Views: 1410
|
|
Close up of Heater and Water Plumbing cover in bathroom
Date: 03/06/2004
Views: 1340
|
|
|
Heater and Water Plumbing Cover in bathroom, shower stall to right
Date: 03/06/2004
Views: 1322
|
|
Turn signals and Brake lights added to the Old 8 lamp warning system was
Date: 03/06/2004
Views: 1444
|
|
Back of bathroom wall,picture inside rear bedroom
Date: 03/06/2004
Views: 1545
|
|
|
heater hoses connected via hose barb to copper pipes that goes around shower stall to heater
Date: 03/06/2004
Views: 1257
|
|
back of bathroom(in bed room) copper heater pipes connect to heater hoses, heater on right between shower stall wall and bathroo
Date: 03/06/2004
Views: 1380
|
|
close up of heater hose connections on rear of bathroom
Date: 03/06/2004
Views: 1415
|