Next (and to some degree - during) we built the bathroom walls and started the plumbing...
I used cpvc for the in-wall pieces that drop through the floor and pex underneath.
Kitchen sink supply drops... Notice the black pipe plumbing in this pic... propane plumbing in progress as well.
Started framing in the bathroom and cut the *shudder* first and (hopefully) only hole through my roof.
We used some scraps of wallboard to support the FRP in the bathroom.
FRP up on the forward wall... installed a ridiculously large medicine cabinet for the size of the bathroom. Intentionally set up the mirror to open on the right, so the Mrs can open it and do her hair from outside the bathroom.
Completed bathroom (minus door and somewhere for the waste to go, both of which we are working on)
Well, that's enough posting for one night... stay tuned.