Sorry, no videos. You may have noticed my build thread is rather neglected in the last 5 months or so (as is the bus..).. But here are a couple photos I do have on hand showing the idea.
In this second photo you can see the how the side rib/roof bow piece no longer touches the floor or chair rail. I've put in sections of hat channel as shown here to re-attach them.
In case you are wondering: There are many reasonable ways of doing the lifting. I used the scaffolding method proposed by nat_ster here to raise what's left of the roof and walls. Weight wasn't any problem with all the glass and side sheet metal removed! If it were heavier the scaffold still would have carried it fine but jacking by winding the leveling screws would have been more difficult. In that case one could jack with hydraulic floor or bottle jacks and adjust the leveling screws for safety in case of jack failure. Or so that the jack could be moved to each corner in turn, in case of not enough jacks.