I used the same method as the full sized buses to do my shorty. Weld some temporary "jacks" from 1" square steel tubing into the pillars, cut, lift, level, weld in new supports, remove jacks. Watch this guys videos, he's got a lot of info and details:
https://youtu.be/ooGztjaHpMQ