Quote:
Originally Posted by Wutm8
Rameses did you ever manage to unlock 6th? Anything new on your build?
|
Nothing new as of now. I recently finished tearing out the ceiling, walls, floor, and insulation. I'm about to start removing rivets for the top rub rail since that's where I'll be cutting for the roof raise.
The only thing I have to do before I start cutting for the raise is to fabricate and install leveling jacks so I can make sure everything's square before I make any cuts. I'd hate to make what I thought were parallel and perpendicular cuts only to find out that things were racked.
I wasn't able to unlock 6th. Turns out the Allison DOC software doesn't have that ability and the transmission computer does in fact need to be reflashed. I have a plan on how to get it done though. I'll post about it if it works.