The Build
|
So far we have the coach sealed, insulated, and new floor, walls, ceiling, and insulation installed. The interior front cab area is still unfinished. We have a bed and small kitchen counter installed. The counter is basic and will be upgraded eventually. |
|
All times are GMT -5. The time now is 11:23 AM.