Journey with Confidence RV GPS App RV Trip Planner RV LIFE Campground Reviews RV Maintenance Take a Speed Test Free 7 Day Trial ×


The Build
So far we have the coach sealed, insulated, and new floor, walls, ceiling, and insulation installed. The interior front cab area is still unfinished. We have a bed and small kitchen counter installed. The counter is basic and will be upgraded eventually.
interior to rear. The space between the wall and ceiling will be for cables, wires, etc. We plan to install a raised bed at the back, but the...
exterior left. Warning lights removed and patched with sheet metal.
exterior front left. Warning lights removed and patched with sheet metal.

All times are GMT -5. The time now is 11:23 AM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.