Journey with Confidence RV GPS App RV Trip Planner RV LIFE Campground Reviews RV Maintenance Take a Speed Test Free 7 Day Trial ×


Picture 45 of 112 from Album Our bus, WildThingTheBus on Instagram
Bus door is done. I bolted the two halves together using steel bed rails. One rail at the top and one at the bottom of the door. Four lag bolts each rail with lock nuts.
Bus door is done. I bolted the two halves together using steel bed rails. One rail at the top and one at the bottom of the door. Four lag bolts each rail with lock nuts.
Picture Added 09-25-2022 09:21 AM
Added by Peterjk

All times are GMT -5. The time now is 05:54 AM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.