need to find better software but the dc side is going from the alternator 200A leece/neville to the house distribution block 1.25''x 3/8''. I will have a 500 amp Solenoid switch right after the alternator controlled by a battery sense voltage isolator to ensure the coach batteries get charged first and some manual override switches to disconnect the house from the coach when needed or use the house to help start if needed.
The distribution fuse bank will have:
1.) 500A house battery bank
2.) 400A fuse for the magnum energy ms2812 inverter/charger
3.) 150A midnight classic 150 solar MPPT charge controller
4.) 400A Onan generator QD7500 ( 1/0 AWG) for starting
5.) 200A lead to the front DC panel for House ACC and Ham radio amp
6.) 150A ac/Dc distribution panel wf-8930 50A Ac
The ac side is going the typical route: generator and shore power (50A) going to an auto transfer switch which goes to a 8 spot 100A Ac panel with a double 30 amp breaker going to the inverter ( has built in pass through) which goes to the Wf-8930 panel that will feed most of the buses ac needs. electric heat loads will remain in the 8 spot panel.
The generator is neutral isolated and has a chassis ground, same for the inverter. All electrical panels have wiring separating the grounds and the neutrals to keep continuity. All AC wiring is SOOW type, any exposed under the bus is shielded with wire loom.