1998 VanHool 45' coach conversion

Offgr1d

Senior Member
Joined
May 28, 2015
Posts
238
Location
Las Vegas
Starting the thread for my coach buildout.

The day I got the bus!!!

7BF0777E-A04D-4457-AB5F-5E3A34F44CFF.jpg
 
Last edited:
Working on seats!! Took in all about 2 days to get them all unbolted and out of bus.
5A59CD02-6986-422A-A0E2-9AD01532FA15.jpg


B1F8B4AC-F008-4F85-88E7-A367652AB242.jpg


When I just about finished the main part of seat removal (57 seats!!!) and was about to start on the parcel racks - that was ridiculous to remove!!!
 
Last edited:
Thanks!
I'm much further along though - I'm pulling my old pics and trying to get the timeline of my build going and wanted to document it somewhere.

I know it's not exactly a skoolie, but I figured we got bus lovers here ❤️��
 
I drive an MCI J4500 on Sundays going to get vacationers from Galveston to Hobby airport and return to Galveston with others. The company has three VanHools. I LOVE the set-up. Never driven one. But the drivers say it's like the MCI, riding on glass! She's a BEAUTY!!!! I'll be following this build with interest! AND you already have a bathroom toilet installed (jealousy now ensues:baconflag:)!
 
Last edited:
Thanks!
I'm much further along though - I'm pulling my old pics and trying to get the timeline of my build going and wanted to document it somewhere.

I know it's not exactly a skoolie, but I figured we got bus lovers here ❤️��

I definitely love buses.:thumb:
 
This is taking the parcel racks down - huge projects as they were literally installed as one long unit - had to cut them with sawzall as I unbolted sections from roof.

123EC6A9-5596-4E55-A377-1451603AAB79.jpg


855144CF-7583-4BF9-88A4-33E3E2BF9809.jpg


E1D58DA0-0A91-4862-8128-998A13CD251F.jpg
 
Last edited:
Process of removing seat tracks and entire floor (as around old barroom had some damaged wood.
In the process I added new reflectix radiant barrier insulation and new MLV (mass loaded vinyl) it's 1lb per SF!! Old MLV was in bus over engine area but was damaged when we pulled up floor. So now New MLV is through entire bus floor and the 1/2 wood changed to 3/4 exterior grade and sealed plywood.

Reflectix
new MLV
New 3/4 plywood
New laminate

6D0FCC2D-3D23-452B-A7E9-E8F854BDE0D1.jpg


217F5768-9F62-4342-AD13-E9B701C6A3C3.jpg


32817BC5-C9A0-452F-BCB9-8FD67937519A.jpg


FB88CB8D-F423-49C3-98CF-20E0085FFC66.jpg


3683BED3-6893-4B5C-9421-F689090391C9.jpg


And now the sweet new plywood gets laid down...
Added a foam sound strip between any metal frame and where the plywood gets screwed to floor frame. So basically no metal to wood contact anywhere.

2EC95301-A82D-4F08-B20D-7B3DDCF68024.jpg
 
Last edited:
Cut huge hole in new floor!!! For the "drop down" shower pan and linear drain. Lots of welding fun was here. The entire pan will be get plywood, vapor barrier, wet board then tile..

8A606707-F510-40EC-89CF-EFF90FE66250.jpg


D905BB6D-0E9F-425B-B5F9-3BB5086EAEA5.jpg


1C160B51-35F6-416E-BC55-2EA6CB63B505.jpg
 
Last edited:
Yay for a toilet!!!
For real on the porcelain too. - pretty nice model by dometic.

FC296624-1F8B-4E06-8C93-F6B40C2FF2A7.jpg


Wall tile worked up, and the dark laminate wall cover going on (still not finished with the fine detail work - goal was a functioning bath ASAP as I live in it full time while doing the rest of conversion.

94F3639E-3A02-42BF-987A-64010701E902.jpg
 
Last edited:
I wanted to be outrageous and crazy and decided to mold a polished concrete counter almost 6' wide for the bathroom

26982670-BE97-44C9-9E75-AB48B1DBE7D8.jpg


558A3828-60B0-48CD-A959-E785C6E0031F.jpg


7F91A176-19EE-4154-82A0-006FDCDE3715.jpg


3EDBCFB0-B140-437F-8E42-9BE1B5974D82.jpg


C0C6BA06-29B3-4941-83C6-2B4510E37641.jpg


25DABDDD-A0D5-4BC0-A590-F71BE52D4FE5.jpg


Wet polishing the concrete.

88A8E1BA-9703-419F-AEB6-E5E10E824D10.jpg


Actually getting shiny! Mad smooth...

Here is a ready to install shot of the counter.
2E161788-10EE-4A8A-BE05-C706F1488255.jpg
 
Last edited:
Counter frame welded and placed in bathroom:

55A41140-39CE-4B43-B92C-D3BC9744DE34.jpg


265FE152-7B72-432F-84CD-0EF6D773C664.jpg


C7B66EFD-2369-45A2-A58A-8C37DA046ABA.jpg


Now let’s place the counter on...It was a little heavy

025E5AE8-5E00-4095-996A-49671E9E7437.jpg


5B4E074C-636F-4037-A95C-89410326180B.jpg
 
Last edited:
Time to secure my home with RFID keyless entry on the (always) air powered door. I use a silent compressor and detached the door air from bus air tanks.

D858FD2A-9546-4B33-93F9-E1BCB5F509FC.jpg
 
Last edited:

Try RV LIFE Pro Free for 7 Days

  • New Ad-Free experience on this RV LIFE Community.
  • Plan the best RV Safe travel with RV LIFE Trip Wizard.
  • Navigate with our RV Safe GPS mobile app.
  • and much more...
Try RV LIFE Pro Today
Back
Top