bachataBus
Advanced Member
My wife and I are converting a shortie 1997 International. We're nearing the insulation stage, and are currently planning on doing spray foam. We're planning on doing 2 inches of spray foam on the ceiling/walls.
Given that the hat channels are about 1.5-1.75 inches tall, even if we only have 1/2 inch of strapping that leaves a 1/4 inch gap between the spray foam and the eventual ceiling/walls. I realize that air gaps *are* the insulation, but is there a downside to having these empty gaps? Noise? Structure? Can we have 1 inch of strapping (two peices of 1/2" ply for thermal break) and have a 3/4 inch air gap?
:Thanx:
Given that the hat channels are about 1.5-1.75 inches tall, even if we only have 1/2 inch of strapping that leaves a 1/4 inch gap between the spray foam and the eventual ceiling/walls. I realize that air gaps *are* the insulation, but is there a downside to having these empty gaps? Noise? Structure? Can we have 1 inch of strapping (two peices of 1/2" ply for thermal break) and have a 3/4 inch air gap?
:Thanx: