Hello redbaron, PAPA KIRK here.also shooting from the hip from every single roof raise video that I have watched and that is about 13 of them I don't think I would cut Above the windows. If you were to go that way I think I would have professional do that it is a little more involved then you think. I would cut about 10 inches below the windows add 1 1/4 square steel up in the hat channel and down in the channel about 12 inches each way add new hat channel in between that weld it in and steel rivets top and bottom. Don't forget to put Jacks on front and back of bus on the frame before cutting of the top. Because when you cut the bus will flex.. I hope this helps you a little bit. I know it sounds like a lot but the people you love will also be in the bus with you. God bless and good luck. Let me know what you do thank you.
Last edited: