I'm going to be building the tray for my tub which will be projecting below the floor a few inches, and I want to make sure I have sufficient clearance for everything. Right now, I'm planning on having the bottom of this tray be 8" below the level of the factory floor.
I'm planning on having a waste water tank like this one: https://www.amazon.com/Class-Customs-Gallon-Holding-WT-4000/dp/B07NLLQDC1/ suspended underneath the bottom of the tub tray. This tank is 9" high, and the skirt on the side of my bus extends about 20" below the level of the factory floor, so if the bottom of the holding tank is flush with the bottom of the skirt, there will be a 3" gap between the tub tray and the tank.
I was thinking I could just have a pipe connecting the tub drain with an opening on top of the waste water tank, but I think that might be an odor problem. What kind of attachment should I have here, and what kind of clearance does it require?
I'm planning on having a waste water tank like this one: https://www.amazon.com/Class-Customs-Gallon-Holding-WT-4000/dp/B07NLLQDC1/ suspended underneath the bottom of the tub tray. This tank is 9" high, and the skirt on the side of my bus extends about 20" below the level of the factory floor, so if the bottom of the holding tank is flush with the bottom of the skirt, there will be a 3" gap between the tub tray and the tank.
I was thinking I could just have a pipe connecting the tub drain with an opening on top of the waste water tank, but I think that might be an odor problem. What kind of attachment should I have here, and what kind of clearance does it require?