I sold my bus to a very nice lady who's making it a mobile clinic for animal prosthetics. My build was solid but she needs to tear out like 50% and reconfigure the interior. We are already starting on our next bus and I don't have time for both. I'd be available to answer any questions about the build.
2003 E350 Super Duty 21 foot transit bus
She needs:
Roof top a/c unit installed. I left a space in the framing so it's easy to cut through the fiberglass and fit it.
Rear hitch installed with caddy for generator.
Generator on rear caddy with pass through for wiring, 110v hookups for a couple tools and the rooftop ac
400w solar, inverter etc. Has a couple 420ah deep cycles but might want to swap those to golf cart or AGM batteries for space. Wiring needs to be relocated, isolator installed from alternator to avoid interference with solar. Has a switch but isolator would avoid forgetting to disconnect.
Small rebuild of the floor where handicap ramp is being uninstalled. Removal of secondary heater, just needs tubing couple after removal. Relocating diesel heater, just small hole in floor and repair old location.
Total I'm estimating about 10-12 days of work going at it full time with parts on hand.
Alternately if your in the nearby area Abq/Phoenix etc she might be able to drive out and then pick up. The 'pro' builder quoted her an insane price. Might be a couple items I didn't mention. I'm going to link her to the thread so she can register and respond too.
Super nice lady, does good stuff for pets I'm sure there's a quality builder on here who can take the job, do it well and get paid for the effort.
Cheers.
2003 E350 Super Duty 21 foot transit bus
She needs:
Roof top a/c unit installed. I left a space in the framing so it's easy to cut through the fiberglass and fit it.
Rear hitch installed with caddy for generator.
Generator on rear caddy with pass through for wiring, 110v hookups for a couple tools and the rooftop ac
400w solar, inverter etc. Has a couple 420ah deep cycles but might want to swap those to golf cart or AGM batteries for space. Wiring needs to be relocated, isolator installed from alternator to avoid interference with solar. Has a switch but isolator would avoid forgetting to disconnect.
Small rebuild of the floor where handicap ramp is being uninstalled. Removal of secondary heater, just needs tubing couple after removal. Relocating diesel heater, just small hole in floor and repair old location.
Total I'm estimating about 10-12 days of work going at it full time with parts on hand.
Alternately if your in the nearby area Abq/Phoenix etc she might be able to drive out and then pick up. The 'pro' builder quoted her an insane price. Might be a couple items I didn't mention. I'm going to link her to the thread so she can register and respond too.
Super nice lady, does good stuff for pets I'm sure there's a quality builder on here who can take the job, do it well and get paid for the effort.
Cheers.