Pictures attached.... Its two boxes beside each other... one good one bad....
I hired a local company, it will remain nameless, it looked reputable and had good reviews. The owner came out a couple of months ago and took a look at the job, took a while to get booked but he was a nice helpful guy and everything seemed good. I did not plan the job, I figured his guys would know how to do it and with everything else going on I wanted to offload some of the work, I figured it was an easy enough job.
Had the work done on Friday, 2 guys show up.... I had a bad feeling already.
I show them the job, I have two 49" long 19X19" underbody truck boxes I purchased, both steel. I tell them I want them under the bus beside my existing truck battery box. We start talking about the skin of the bus somehow, guy comments its thin, I agree (Obs) and we get to talking about the lower rub rail, I tell him if it needs to get cut off it can just go no problem assuming it may be in the way.
I'm at the bus working, I get out of there way and tell them if they need anything come get me, 20 min in they are removing the rub rail, the screws and rivets are a bitch so I tell him he can grind them off if need be, he does.
I leave them for another 40 min, the guy comes over to me and says he cant weld the metal is too thin... I'm a little confused I go to see and they have tacked the box TO THE SIDE OF THE BUS.... Like its sticking out all 19" from the body.... welded to the side of the bus...
so I go " you know thats supposed to be under the bus".... commence the oh **** moment.... so they go at it, get the box positioned..... amid this time they bang the **** out of it.... they manage to hit it with the grinder in spots, dent it in others... the cuts through the bus body look like ****
The guy wants to weld it to my frame, I tell him he can't because I need it inspected to get the title changed..... decides to use the angle to make a frame-up top..... No ****!
They do the second one, it looks good, and is not damaged..... only took 2 tries.......
Now they are coming back tomorrow to finish the job.
The first day they worked 5.5 hours, now they are coming back with some other material to put the final welds on, he says its another hour of work (Hence his 6 saving me another half hour) (I don't know much of anything about welding, hence getting a pro)
Guys say he will complete the entire job for 6 hours paid, and material. Which he says is saving me the hour each day of driving time he would have charged me for the mobile welding.
oh and he's bonding the holes he made, and grinding that down, and he took the rub rail home to fix up and he says he will put it back on... not charging me for that bless his little heart...
This is the welder I've been talking too, I am calling the owner tomorrow morning.
So total amount of work 5.5 hours on site + 2 hours drive time for the two days (half hour each way 2 days) 7.5 hours and he has an hour of welding left so 8.5 hours he "would" be charging me.
His offer is 6 hours total at $120 Hr plus material so thats $720 and material.
Take a look at the pictures and give me your thoughts on what you would pay.
Sorry for the long ass post....
I hired a local company, it will remain nameless, it looked reputable and had good reviews. The owner came out a couple of months ago and took a look at the job, took a while to get booked but he was a nice helpful guy and everything seemed good. I did not plan the job, I figured his guys would know how to do it and with everything else going on I wanted to offload some of the work, I figured it was an easy enough job.
Had the work done on Friday, 2 guys show up.... I had a bad feeling already.
I show them the job, I have two 49" long 19X19" underbody truck boxes I purchased, both steel. I tell them I want them under the bus beside my existing truck battery box. We start talking about the skin of the bus somehow, guy comments its thin, I agree (Obs) and we get to talking about the lower rub rail, I tell him if it needs to get cut off it can just go no problem assuming it may be in the way.
I'm at the bus working, I get out of there way and tell them if they need anything come get me, 20 min in they are removing the rub rail, the screws and rivets are a bitch so I tell him he can grind them off if need be, he does.
I leave them for another 40 min, the guy comes over to me and says he cant weld the metal is too thin... I'm a little confused I go to see and they have tacked the box TO THE SIDE OF THE BUS.... Like its sticking out all 19" from the body.... welded to the side of the bus...
so I go " you know thats supposed to be under the bus".... commence the oh **** moment.... so they go at it, get the box positioned..... amid this time they bang the **** out of it.... they manage to hit it with the grinder in spots, dent it in others... the cuts through the bus body look like ****
The guy wants to weld it to my frame, I tell him he can't because I need it inspected to get the title changed..... decides to use the angle to make a frame-up top..... No ****!
They do the second one, it looks good, and is not damaged..... only took 2 tries.......
Now they are coming back tomorrow to finish the job.
The first day they worked 5.5 hours, now they are coming back with some other material to put the final welds on, he says its another hour of work (Hence his 6 saving me another half hour) (I don't know much of anything about welding, hence getting a pro)
Guys say he will complete the entire job for 6 hours paid, and material. Which he says is saving me the hour each day of driving time he would have charged me for the mobile welding.
oh and he's bonding the holes he made, and grinding that down, and he took the rub rail home to fix up and he says he will put it back on... not charging me for that bless his little heart...
This is the welder I've been talking too, I am calling the owner tomorrow morning.
So total amount of work 5.5 hours on site + 2 hours drive time for the two days (half hour each way 2 days) 7.5 hours and he has an hour of welding left so 8.5 hours he "would" be charging me.
His offer is 6 hours total at $120 Hr plus material so thats $720 and material.
Take a look at the pictures and give me your thoughts on what you would pay.
Sorry for the long ass post....
Attachments
-
IMG_0185.jpg193.7 KB · Views: 55
-
IMG_0186.jpg151.6 KB · Views: 40
-
IMG_0188.jpg144.2 KB · Views: 41
-
IMG_0190.jpg136.9 KB · Views: 31
-
IMG_0191.jpg159.5 KB · Views: 32
-
IMG_0193.jpg152.9 KB · Views: 25
-
IMG_0192.jpg162.8 KB · Views: 26
-
IMG_0195.jpg129.5 KB · Views: 29
-
IMG_0196.jpg112.9 KB · Views: 25
-
IMG_0198.jpg149.8 KB · Views: 29
-
IMG_0199.jpg113.3 KB · Views: 32
-
IMG_0201.jpg95.4 KB · Views: 37
-
IMG_0203.jpg193.8 KB · Views: 34
-
IMG_0204.jpg212.7 KB · Views: 36