Floor is up and completely gone. Im about half way through cutting the nails out. It rains here more than Seattle now and ive got windows that leak. Gotta dry out the floor before i can clean it up, ospho and paint it. Windows will be coming out shortly after that. The tarp will be on it probably till spring..Pulling the floor is a chore...but the right thing to do if you plan on any build out on top of it.