PNWorBUST72
Advanced Member
- Joined
- Jan 4, 2018
- Posts
- 95
So I was thinking of what to use as my base for the bus floor.
Most people just lay 1/2 or 3/4 plywood as the first layer, then add runners, more insulation and then a higher quality flooring before laying the final product I think.
What if you used that PVC or shower stall type paneling as that first layer? Its 100% water proof and your putting Plywood over it anyway?
Just think of it as a way to 100% waterproof the floor from below but not if thats necessary?
Most people just lay 1/2 or 3/4 plywood as the first layer, then add runners, more insulation and then a higher quality flooring before laying the final product I think.
What if you used that PVC or shower stall type paneling as that first layer? Its 100% water proof and your putting Plywood over it anyway?
Just think of it as a way to 100% waterproof the floor from below but not if thats necessary?