The Rockwood Colony
Advanced Member
- Joined
- Jul 16, 2017
- Posts
- 58
Memorial weekend I plan on raising the roof on my 77 passenger Amtran but I still have to get the materials and am still confused on a few things...
1. How much sheet metal to buy and what gauge?
2. We are doing RV windows so do I need the sheet metal shop to cut out the window slots so they have the radius corners perfect or can I install the sheets and then cut them out down the road?
3. What gauge hat channel and type of metal should I use?
4. I still have no idea where to cut through the back of the bus since we want to keep the original door for the "garage" area.
5. We just plan on using a couple floor jacks with 4x4s on them extended to the hat channels on the ceiling to raise it and then use 2x4s extended through the bus windows from one side to the other in the front and the back of the bus to evenly space the raise and for additional support. Has anyone ever done it this way and would you do it again? Will this work?
6. We are riveting the sheet metal on through the old and new hat channels and using 3m panel adhesive instead of welding. We plan on popping out the rivets above the windows and sliding our sheets up in there and re riveting just like most people do but I'm concerned because we only have one row of rivets above the windows. Not two like every other bus I've seen so is it ok to pop all of those out at once? How far should we push the sheet metal up past the rivets above the windows? How do I keep the sheet metal and new hat channel all in place while I rivet them together? I'm wondering if I should just use the adhesive during day 1 to glue the hat channels in place, let it dry for 24 hours, and then the next day start installing sheets after all the hat channels are set in place?
I AM EXTREMELY SORRY AND EMBARRASSED FOR ALL OF THE QUESTIONS BUT.. I literally have zero experience in metal work/auto body so I just need to make sure I don't screw this up! I have small children and a wife to protect so please, any advice or help would be so heatedly appreciated!!!
I really wish someone that has done a roof raise could just help so if you know ANYONE in the SIOUX FALLS, SOUTH DAKOTA area that may be able to help for some extra cash please let me know!
I would also just really like to speak to someone over the phone if not in person with experience on this type of project just to get some advice or help so if anyone is willing to do that please direct message me or email me at benjipike@gmail.com PLEASE AND THANKS SO SO MUCH!!!
1. How much sheet metal to buy and what gauge?
2. We are doing RV windows so do I need the sheet metal shop to cut out the window slots so they have the radius corners perfect or can I install the sheets and then cut them out down the road?
3. What gauge hat channel and type of metal should I use?
4. I still have no idea where to cut through the back of the bus since we want to keep the original door for the "garage" area.
5. We just plan on using a couple floor jacks with 4x4s on them extended to the hat channels on the ceiling to raise it and then use 2x4s extended through the bus windows from one side to the other in the front and the back of the bus to evenly space the raise and for additional support. Has anyone ever done it this way and would you do it again? Will this work?
6. We are riveting the sheet metal on through the old and new hat channels and using 3m panel adhesive instead of welding. We plan on popping out the rivets above the windows and sliding our sheets up in there and re riveting just like most people do but I'm concerned because we only have one row of rivets above the windows. Not two like every other bus I've seen so is it ok to pop all of those out at once? How far should we push the sheet metal up past the rivets above the windows? How do I keep the sheet metal and new hat channel all in place while I rivet them together? I'm wondering if I should just use the adhesive during day 1 to glue the hat channels in place, let it dry for 24 hours, and then the next day start installing sheets after all the hat channels are set in place?
I AM EXTREMELY SORRY AND EMBARRASSED FOR ALL OF THE QUESTIONS BUT.. I literally have zero experience in metal work/auto body so I just need to make sure I don't screw this up! I have small children and a wife to protect so please, any advice or help would be so heatedly appreciated!!!
I really wish someone that has done a roof raise could just help so if you know ANYONE in the SIOUX FALLS, SOUTH DAKOTA area that may be able to help for some extra cash please let me know!
I would also just really like to speak to someone over the phone if not in person with experience on this type of project just to get some advice or help so if anyone is willing to do that please direct message me or email me at benjipike@gmail.com PLEASE AND THANKS SO SO MUCH!!!
Last edited: