Intalleyvision
Advanced Member
I'm ready to raise my roof. I've decided to go with the scaffolding method. My question is how many extra inches do you usually have on the new steel rib piece that overlaps with the existing rib? Like if I'm raising my roof 20", how long does my rectangular tubing need to be? Also what gauge steel would you suggest using? My bus ribs are 14 gauge so I figure that would work fine.