m00py
Advanced Member
- Joined
- Sep 19, 2015
- Posts
- 53
So I'm in the process of ripping the aluminum sheet metal that lines the inside walls of my bus and underneath it all is spray foam that Champion had applied during manufacture. There's spray foam in the walls, in the ceiling and even underneath the bus. I haven't drafted a floor plan yet but since insulation is the first step I figure I'll need to figure out how I'm going to wire things first. So here's the question: Do I scrape off the spray foam and run them through/behind the fresh insulation or do I put the insulation down first then run them on top? I've seen people lay down insulation, then wire, then spray foam before. I'd like not to mess this up so tell me what you did with your wiring, what kind of insulation you put in and why you did it that way. I'll be at that step in this process in no time.